Business strategy — sales process and qualification

The MEDDIC problem

MEDDIC appears on every sales training deck I've seen in the last fifteen years. Ask a sales leader whether their team uses it and the answer is almost always yes. Watch what actually happens in a pipeline review and the answer is almost always no.

What most companies do instead: they ask the prospect "do you have budget?" and call that Metrics. They get the procurement manager's email address and call that the Economic Buyer — it usually isn't. They assume the person who filled in the contact form is the Champion, because that person answers emails quickly and seems keen. None of that is MEDDIC. It's wish-fulfilment dressed up with MEDDIC vocabulary, and it produces the thing MEDDIC was specifically invented to prevent: a pipeline full of deals that feel qualified but aren't.

I've spent over twenty years selling and building sales capability around complex technical systems — Siemens automation and controls, and more recently partner programme development for smart building and BMS vendors. MEDDIC, done properly, is one of the few frameworks I'd defend without reservation. Done the way it's usually presented on LinkedIn, it's closer to theatre.

What the gurus sell vs what actually happens

Search MEDDIC content online and you'll find hundreds of posts explaining what the six letters stand for. Almost none of them address the situations that actually determine whether a deal closes:

  • What do you do when there is no Champion, and you've tried and failed to create one?
  • What happens when the Decision Criteria were written by a consultant you've never spoken to, months before you were introduced?
  • What do you do when the Metrics are genuinely unclear — not because the buyer is hiding them, but because they haven't quantified their own problem?

The guru answer to all three is a version of "go find the Economic Buyer" or "build a stronger business case." That's not wrong, exactly — it's just incomplete to the point of being unhelpful. The realist answer is different: these are the exact moments MEDDIC is supposed to force a decision. Not "how do I fix this," but "do I keep investing in this deal, or do I walk." A framework that only tells you how to pursue and never tells you when to stop isn't really MEDDIC. It's a checklist wearing MEDDIC's name.

The MEDDIC elements — what each one means in practice for technical B2B

Here's each element, guru version versus what it actually means when you're selling BMS, IoT, or HVAC control systems into FM operators, M&E contractors, and system integrators.

Metrics

Gurus say: quantify the ROI. Get a number.

In practice: most buyers can't articulate their own metrics when you first ask. An FM director knows energy costs are "too high" long before they know it's costing them £4.20/sqm above benchmark. Your job in the early stages isn't to capture metrics that already exist — it's to help the buyer define them for the first time. In smart building deals, the metrics that actually move budget conversations are: energy cost reduction per sqm per year, HVAC fault detection hours saved for FM teams (usually costed at £35–55/hr loaded labour), compliance fine or ESOS penalty avoidance, and reduction in reactive FM callout volume. If you're not helping build that number, someone else will, and they'll build it around their own solution.

Economic Buyer

Gurus say: get to the EB. Don't sell to influencers.

In practice: in FM and M&E deals, the Economic Buyer is frequently a Finance Director, Operations Director, or CEO/MD who will not take a cold meeting with a vendor they've never heard of — and shouldn't have to. The real question isn't "can I get a meeting with the EB." It's "does my Champion have genuine access to the EB, and will they use it on my behalf." Chasing the EB directly, over your Champion's head, is one of the fastest ways to lose the Champion you have.

Decision Criteria

Gurus say: understand the evaluation criteria.

In practice: in a meaningful share of technical deals, the criteria are written after the preferred vendor has already been informally selected — often by a consulting engineer or specifier you've never met. If you weren't in the room when the criteria were drafted, you may already have lost, and the "evaluation" you're being asked to participate in is procedural cover for a decision that's been made. Getting involved upstream, before criteria exist, is worth more than any amount of polish on your response to criteria you didn't shape.

Decision Process

Gurus say: map every step of the process.

In practice: the process your contact describes is almost always the optimistic version. Boards get rescheduled. Capex approval slips a quarter. A competing internal project gets prioritised. Add 30–60 days to whatever timeline you're given, as a rule, not an exception — and build your forecast around the adjusted date, not the one you were told.

Identify Pain

Gurus say: find the pain, sell to the pain.

In practice: technical infrastructure buyers rarely have a "burning platform." Pain in this world usually looks like compliance risk that hasn't triggered yet, deferred maintenance that's becoming visible, or a sustainability target that's starting to feel uncomfortable. It's latent, not acute. Your job is to surface it deliberately — through questions about ESOS exposure, EPC ratings, callout volumes, or board-level carbon commitments — not to wait for the buyer to announce it, because in this category they usually won't.

Champion

The most misunderstood element, by a distance. A Champion is not someone who likes your product, responds to your emails, or says nice things in a meeting. A Champion is someone who will sell your solution internally when you are not in the room, who has political capital within their organisation and is willing to spend it on your behalf, and who will give you competitive intelligence — including information that could be uncomfortable for them if it got out. Most contacts labelled "Champion" in CRM systems are none of these things. They're friendly. Friendly is not the same as committed.

The three-tier Champion test

Because "Champion" gets misused more than any other MEDDIC term, it's worth applying a concrete test rather than a gut feeling. I use three tiers:

TierBehaviourWhat it means for your deal
Tier 1 — Friendly contactReturns calls, answers basic questions, seems positive about the solutionA source of information, not an advocate. Deals resting here alone are not forecast-ready.
Tier 2 — AdvocateHas spoken positively about your solution to others internally, shared intel on competitors, flagged risks in the processReal progress. Still not sufficient on its own for a Commit forecast without EB access.
Tier 3 — True ChampionHas actively sold on your behalf in rooms you weren't in, given you a path to the Economic Buyer, shared something that could embarrass them if it leakedThis is what "Champion" in MEDDIC actually means. Deals with a genuine Tier 3 champion behave completely differently to deals without one.

Most pipelines I've reviewed have plenty of Tier 1 "champions" and very few Tier 3s. If your Commit forecast is built on Tier 1 relationships, the forecast is optimistic, not honest — regardless of what the CRM field says.

What no-qualification looks like, and what it costs

The pattern is recognisable to almost anyone who's run a technical B2B sales function: a large pipeline, a stubbornly low win rate, proposals written reactively in response to inbound RFPs, and months of effort spent responding to tenders where the competition was effectively selected before the document was issued.

MEDDIC, at its core, is not a framework for winning more deals. It's a framework for deciding where not to spend time. That reframing matters, because it changes what "success" looks like when you apply it properly. An honest MEDDIC review of a typical technical sales pipeline will disqualify 30–40% of what's currently marked "active." That's not a failure of the review — it's the review working as intended. Every hour spent on a deal with no Champion, no defined Metrics, and criteria you weren't involved in writing is an hour not spent on a deal you can actually influence.

Making MEDDIC operational — not aspirational

There's a clear line between companies that use MEDDIC as wallpaper and companies that use it as an actual decision tool, and it shows up in one place: the pipeline review.

If your pipeline review is a forecast exercise — where the number gets negotiated between rep and manager until everyone's comfortable — MEDDIC is decorative. The fields exist in the CRM, but they don't change any decisions. If your pipeline review is a qualification exercise — where deals can be, and regularly are, downgraded or killed based on what MEDDIC reveals — MEDDIC is operational.

Practices that make the difference:

  • A one-page MEDDIC scorecard per active deal, updated weekly by the rep, not reconstructed from memory before the review meeting.
  • A hard rule that only deals with documented Metrics and a Tier 2+ Champion can sit in the Commit forecast category — no exceptions for deal size or how much the rep "just knows" it'll close.
  • Pipeline review questions that ask "what is the Champion doing right now, on our behalf, that we didn't ask them to do" — not "when do you think this closes." The first question is falsifiable. The second invites optimism.

MEDDIC in smart building and BMS deals — specific adaptations

The framework doesn't change in this sector, but the specifics of each element do. This is what I use when applying MEDDIC to BMS, IoT, and HVAC control sales:

Metrics that land with FM and building owners

  • Energy savings, expressed in both kWh and £/year — building owners think in pounds, engineers think in kWh; you need both.
  • HVAC fault detection time saved for FM teams, costed at typical loaded labour rates of £35–55/hr.
  • ESOS compliance cost avoidance, where relevant to the building's energy assessment cycle.
  • DEC/EPC rating improvement, particularly for public sector and MEES-exposed commercial landlords.

Who the Economic Buyer actually is, by deal size

Deal sizeTypical Economic Buyer
Under £50kFM Director or Operations Director
£50k–£250kFinance Director or CEO/MD
Over £250kBoard-level sign-off or a formal procurement committee

Champion types worth developing

In FM and M&E organisations, three recurring Champion profiles are worth deliberately cultivating: the BMS engineer who's frustrated with outdated tools and wants to modernise, the FM director under sustained energy-cost pressure from above, and the sustainability manager carrying a carbon target they don't yet have a credible path to hit. All three can become genuine Tier 3 Champions — but only if you give them ammunition specific to their internal audience, not a generic product pitch they have to translate themselves.

The Decision Criteria trap

Lowest price is rarely the stated evaluation criterion in an M&E or BMS tender, but it's very often the real one once the paperwork is stripped away. If the client hasn't agreed evaluation criteria in writing before the tender goes out, you are, in practice, entering a lowest-price beauty parade regardless of how the RFP is worded.

When to walk away

This is the question MEDDIC forces that most guru content avoids entirely: when is the correct answer to disengage?

Signs a deal has no realistic path to close:

  • No identified Champion after two genuine attempts to develop one.
  • The buyer's budget cycle doesn't align with your sales cycle, and there's no business case compelling enough to accelerate it.
  • Decision criteria are already written, and you were not the reference point used to write them.
  • The buyer is clearly using your proposal to sharpen a competitor's pricing or specification, rather than genuinely evaluating you.

Walking away cleanly — and staying visibly in the relationship for the next budget cycle — is a far better use of a sales team's time than a six-month pursuit that was never going to close. This is uncomfortable to say out loud in a forecast meeting, which is exactly why most companies don't say it.

The 90-day implementation plan

For sales leaders who want MEDDIC to be real rather than aspirational, here's a practical sequence:

  • Month 1: Score every currently active deal against MEDDIC. Be honest about which are genuinely qualified. Have the direct, sometimes uncomfortable conversation with reps about the rest — including the ones that need to come off the forecast.
  • Month 2: Run opportunity-specific workshops on the major remaining deals. For each one, build a full MEDDIC map and a concrete Champion development plan — specific actions to move a Tier 1 contact to Tier 2, and Tier 2 to Tier 3.
  • Month 3: Embed MEDDIC into the standing pipeline review cadence. Build and start using the one-page scorecard. Train the discipline of only moving deals into Commit once Champion and Metrics are actually confirmed — not assumed.

MEDDIC is a thinking discipline, not a checklist

The sales frameworks that actually work are the ones that change how people think about a deal, not the ones that add fields to a CRM form. A completed MEDDIC record isn't the goal. A sales team that instinctively asks, on every single deal, "who is selling this internally right now, when I'm not in the room" — that's the goal, and it's a much higher bar than filling in six boxes.

Most companies that say they use MEDDIC have the vocabulary. Very few have built the discipline underneath it. The gap between the two is exactly where deals get won or lost in complex technical sales.

Want an honest MEDDIC review of your current pipeline or help building a qualification process for your technical sales team?

Get in touch